• Search Title Only

Marine Construction Pile Driving Barge - Special Winter Price - $109,500 - (Minden, LA)

12 x 30 Pile Driving Barge-New Hydraulic pile driving hammer with 10,000 foot pounds of energy. 32 ft. derrick. 4 hydraulic spuds, 30 ft. (or longer if needed). The derrick travels approximately 16 ft, enabling driving of multiple pilings and bolting headers on before moving barge. The spuds and derrick lay down giving a height of approximately 9 1/2 ft. Track extension allows hammer to be put 8 ft. in front of barge. Includes 2- 90hp Mercury outboard motors, fully rigged with helm. Lead time is 8 weeks. This is a fantastic winter sale price that won't last long.

Marine Construction Pile Driving Barge - Special Winter Price

ADVERTISEMENT

Posted in Minden, LA, Business for Sale
From ebay.com - 1 month ago